Kunshan Gaoqiang Industrial Equipment Co., Ltd.
FAQs about Dryzone Dry Cabinets

FAQs about Dryzone Dry Cabinets

What is the normal packing?

Plywood packing which is free of inspect in all the country according to IPPC( International Plant Protection Convention). 

How about the lead time?
  • If have stock,the lead time is 7-10days;

  • If standard normal dry cabinet (stainless steel and baking dry box exclude) do not have stock, lead time is 10-15 days;

  • If customized dry cabinet, backing dry box, stainless steel cabinet, lead time is 30 days.

How long is the warranty?

2 years.

What is the trade terms we support?

EXW, FOB, CIF.

What is the certificate we have?

UL, CE, RoHS, ISO, etc.

What is the payment terms?

100% T/T in advance or before shipment.